EXECUTING AGENCY: WATER SUPPLY COMPANY

TIME OF COMPLETION:

FINANCIAL PROJECT SCOPE: 2.500.000.000 drachmas

The project aims to:
a) construction of reinforced beam at the coronation of the wall to support the channel.
b) construction of inclined prestressed anchors consisting of three high-strength cables 160/180 Kp/mm2 diameter of 0.6'', placed in the free lateral wall of the channel at 1.0 m space intervals, fastened to the underlying soil and prolonged by prestressing force of 44 MP.
c) compressed embankment construction along the open aqueduct of Mornos and adjacent to its free vertical wall, for static relief of the wall.
d) construction of embankment with crushed material type STS - 0150 along the open aqueduct Mornos and adjacent to the upstream embankment, where a graben exists, created by the excavation during construction of the aqueduct.
The project was tendered in a public call.

*in joint venture.