EXECUTING AGENCY: ATTIKOS ILIOS S.A. (group of companies Mantonanaki)

TIME OF COMPLETION: 2004

FINANCIAL SCOPE OF WORK : 1.174.878 €

The project involves the internal arrangenents of the ground floor areas of 17 houses in the hotel complex of Grand Resort Lagonissi. In partcular there was conformed four areas. The first concerned the restaurant Mediterraneo, the second concerned the gym and massage rooms and Jacuzzi, the third involved the BLUE SPA rooms (steam, color, spa, manicure, pedicure, etc.) and the fourth involved the formulation of WC and public douches for the beach.
When we arrive at the hotel complex, we receive the areas to be formed at the stage where they had completed the concrete bearing structure and were built some brickwalls. The shaped structures had to be demolished, due to change in the design. An important point, also, is that, in ground floor rooms, which were on the sand, debris had entered from the sea, as the maximum wave was entering in these areas.
Our first concern was to clean the premises and the construction at external and upon the sand of a walkway and a parapet made of reinforced concrete, to protect our structures internally. Then proceed with the construction of new panels and ceilings of moisture resistant plasterboard. Continuing we complete the coverage with various materials of high cost and architecture. Some of them are: bamboo floor, covering of floors and walls with burnt black granite nero asolutto, Zimbabwe, coating with black glass mosaic tiles, upholstered, oak paneling, etc. At the same time electromechanical work was performed beyond the usual practice. for example is mentioned the absorptive ceiling in the kitchen of the restaurant, fire fighting networks, networks of sound installation, etc.
It should be noted that all work performed while the hotel was running and the beach in use.