EXECUTING AGENCY: DIRECTORATE OF INFRASTRUCTURE / H.A.G.S.

TIME OF COMPLETION: 2002 - 2004

BUDGET: 5.865.017,00 €

The project involves the rearrangement of the existing building and th erection of new building for hydrotherapy. Specifically:
Rearrangement part of the Second floor and the entire C floor and the roof to act as part of the natural medicine and rehabilitation centre (N.M.R.C.).
Construction of new building (Added hydrotherapy building) which is part of hydrotherapy of NMRC. The construction of two hydrotherapy pools and a walking track, the construction of auxiliary and administrative premises and complete electromechanical facilities.
Modernisation of electromechanical installations of the existing building. Replacing the old drainage system and construction of a new central sewage pumping station to connect the hospital with the city's network. Replace the entire water supply and fire fighting network and replace the entire network of old electrical and fire detecting with new wiring to operate the hospital in one piece.