EXECUTING AGENCY: DIRECTORATE OF TECHNICAL SERVICES OF PIRAEUS PREFECTURE

TIME OF COMPLETION: 1994 - 2000

BUDGET: 1.186.440.678 GRD

Design and Construction (earthworks and civil engineering works) of section of the road connecting the Old Epidaurus with Galata, and in particular from the K.P. 5+400 to K.P. 9+700. By the construction of this section is completed the most of the above mentioned route and achieved thus the minimizing of the distance and time connecting the region Galatas - Poros. The road, is passing through rocky soils in total, with very high slope gradients and the construction is characterized particularly difficult.
The project was tendered in competition with the method of Design - Construction.