This is a project that has the purpose of carrying water for irrigation of the fields in the area and for watering of Amfilochia city, by the river Acheloos, to the area of Valtos. This is achieved by:

  • an artificial canal made of reinforced concrete, varying in width, length of approximately 30,000 m, and
  • a tunnel of 2,000 m length approx.

There are two pumping stations for 36,000 m3 / H