EXECUTING AGENCY: Special Service for Water Supply and Sewerage/

TIME OF COMPLETION: ONGOING

FINANCIAL SCOPE OF WORK : 70.000.000 €

The project includes:

  1. The water treatment refinery (Asterio) to supply the industrial area and municipalities in the prefecture of Achaia.
  2. The steel pipe for water supply from the dam Peiros - Parapeiros, of Patras refinery , with total length of 31.560m (pipeline P).
  3. The steel pipeline for water supply, from the Asterio refinery, of industrial area of Patras and municipalities in the prefecture of Achaia, with total length of 23.890m (pipeline M).
  4. Networks of polyethylene pipelines (secondary pipeline M) for the water supply of settlements in the prefecture of Achaia, the total length of 40 kilometers.
  5. Works for the routing of the network of steel pipes and polyethylene pipes:
    • construction in new alignment of approximately 3.5 km provincial road.
    • opening at approximately 3 km of existing rural road.
    • rehabilitation of pavement in existing roadways and provincial highways.

The project is in its final stage (manufactured the 85% of the project) with provision for completion by the mid of 2011.

*in joint venture